The Regio 90 was a project implemented by Premier Trains to replace life expired stock.
It's is a flexible system that allows interchange of various rolling stock units.
It has the following components:
Regio 90 Carriages
Regio 90 DMU
Regio 90 DVT
Go 90 Carriages
All units are interchangeable.
The coaching stock can be added into the middle of the DMU units, either 1 Regio 90 carriage or two Go 90.
Up to 3 DMUs can be coupled together. Coupled to form 4,5,6,7+ 8 car units
DMUs can be also be used as a driving unit for loco hauled stock when a DVT isn't available.
Implementation:
The system has proved successful however it's introduction has been restricted for the following reasons:
Costs of new units
Availability of existing trains deemed to be of an 'acceptable' standard.
Reluctance to move from Loco Hauled Stock to multiple units (only applies to DMU).
Criticism:
Some passengers have complained that the new units offer lower levels of comfort to the units they replaced. This is due mostly to a more spartan interior and harder seating.
Where DMU's have replaced loco hauled coaches there has been a drop in the number of seats available
Future
Whilst the project has proved popular and successful only life expired trains have been replaced.
Though PT have a 'vision' to overhaul and modernise their fleet- the size of the company and range of rolling stock are prohibitive.
At present the capital is not available to extend the project further and order more trains.
Instead PT and overhauling existing stock and acquiring replacement stock second hand.
It is therefore unknown whether PT will ever re-commence the project

 

Share on Bluesky Share on Facebook


  • Newbie
  • *
  • Posts: 11
    • View Profile
Re: Regio 90 Project
« Reply #1 on: November 15, 2012, 05:01:33 pm »
sounds right. Basically the plan was abandoned mid-implementation. Go 90 being lightweight? there could actually be 3 types, normal light and light with commuter doors and interior? the DVT's where never built or maybe just 2 or 3?

The MU's could probably pull more carriages.

The Regio 90 stock is designed to be extremely robust but is technically simple to save cost. such as manual doors. whilst they are slightly basic they do have a pleasant  ambience, and you also have to remember the stock they did replace was fairly dire. dirty, scabby unreliable. this was stock older/worse than the cattle class after all. the number of units built is slightly more than what it replaced to increase frequency and train length.

another part of the Regio 90 plan unrealised was the creation of new locos. instead older stock is being re-engined (class 57 style)

  • Administrator
  • Hero Member
  • *****
  • Posts: 594
    • View Profile
Re: Regio 90 Project
« Reply #2 on: November 15, 2012, 05:40:06 pm »
Agree with all that.
Go 90 is lightweight.
Maybe for MU's 2 Regio 90 or 3/4 Go 90?
Think the criticism is just misty eyed romanticism, old coaches where nice at one point, with cushiony seats and compartments. However by the end they where battered and decrepit, not too mention incredibly old- probably 1930's
 

  • Newbie
  • *
  • Posts: 11
    • View Profile
Re: Regio 90 Project
« Reply #3 on: November 15, 2012, 07:56:46 pm »
that's probably about right for MU's. could probably pull more but they feel this meets operational requirements best.

  • Administrator
  • Hero Member
  • *****
  • Posts: 594
    • View Profile
Re: Regio 90 Project
« Reply #4 on: May 28, 2013, 04:31:06 pm »
Why is it called G0-90 because it was implemented in the 90's.

  • Administrator
  • Hero Member
  • *****
  • Posts: 1154
    • View Profile
Re: Regio 90 Project
« Reply #5 on: May 28, 2013, 04:37:54 pm »
Presumably. Not sure when the project was. Maybe 96?